Sunday, October 30, 2011

053 [W13] 3D MODEL RENDERS

|| Time-lapse of model construction ||


|| PERSPECTIVE RENDERS ||

|| Perspective One || Access




















|| Perspective Two || Speaker on Stage



















|| Perspective Three || Conference Room




















|| Perspective Four || Food collection facility

Saturday, October 29, 2011

052 [W13] D.D SECTIONS

|| Following are some sections of my entity ||

Section A


















Section B

051 [W13] D.D DETAILS

In order for my design to work..

|| Practical & Feasible ||

Detail Sketches

|| Shipping Container Corner ||














|| Roof - Solar Panel ||














|| Connections and Services ||






































|| Trailer and Box Truss ||






































|| Wall Pivot ||













|| Wall Concept ||

























|| FINAL DETAILS ||


|| Wall Pivot ||














|| Solar Panel in Roof ||









|| Connections and Services ||

Friday, October 28, 2011

050 [W13] D.D PROGRAM OF ENTITY

|| Thoughts ||





































|| Programming the Concept? ||





































|| Rural Town Layout ||





































|| Container Schedule ||





































|| Thoughts ||

Thursday, October 27, 2011

048 [W13] D.D STRUCTURAL

Below explains the concept on how the shipping containers are moved onto the Box truss's. It also shows how and which services will utilize the Box truss area.

|| Testing ||





































|| Container position - Testing Second Level ||





































|| Testing Layout ||

047 [W13] D.D WALL CONECTIONS

The follow shows the idea behind cable drawn walls which fold down 90 degrees, connecting with its counterpart to create useable pathways between the shipping containers:

Summary of general shipping container:

|| Time-Lapse of pivoting platform ||





|| Closed - On Arrival ||
|| Opening ||
|| Opening ||
|| Complete ||



Wednesday, October 26, 2011

046 [W13] DESIGN DEVELOPMENT

|| Testing - Second Level ||





































|| Testing - Ground Floor ||
|| Ground Floor - Cad Complete ||
|| Second Floor - Cad Complete ||